The problem differed. The rigor didn't.
34% margin recovery
4 platforms unified in one data layer
$2.1M in recoverable overhead identified
19-day cycle cut to 6
Distribution network redesigned after a capacity acquisition doubled SKU count and collapsed pick accuracy to 61%.
Order-to-ship cycle rewritten for a mid-market manufacturer whose manual hand-offs were absorbing three weeks of lead time.
ERP, WMS, CRM, and 3PL portal reconciled into a single source of truth, eliminating 11 hours of weekly manual reconciliation.
Eight-week diagnostic of a $40M industrial services firm revealed where margin was leaking and ranked fixes by payback period.
Sectors change. Diagnostic rigor doesn't. Each engagement starts with measurement, ends with a handoff the client operates without us, and closes with documented before-and-after figures.
Have a problem worth measuring?
If your current system was built for a smaller company, we can show you what the gap is costing and what fixing it actually takes.
